Proposed Waste Management Facility at Pontypool, S.E. Wales (December 2006)

 

 

 

Shanks Waste Management Ltd – Proposed Waste Management Facility at Shanks, Pont-y-felin Industrial Estate, New Inn, Pontypool

 

 

Back to the Main Index

Contents Volume 2 – Environmental Statement 

Environmental Statement (Text and Glossary)  (view)

Appendix 1 - Introduction -    PAS1 - Site Location Plan  (view)

                                                    PAS2 - Planning Application Boundary  (view)

Appendix 2 - Approach to the Environmental Statement – Consultee Responses  (view)

Appendix 3 - Scheme Description -    3.1 - Outline Decommissioning Programme for Pontypool HTI (view)

                                                                    3.2 - Waste Estimates – Outline Decommissioning Programme for Pontypool  (view)

                                                                    3.3 - Environmental Impact Matrix – Decommissioning and Demolition works at Pontypool  (view)

                                                                    PAS3 - Aerial Photo of Operational Incinerator Site  (view)

                                                                    PAS4 - Site Areas to be Demolished / Retained  (view)

                                                                    PAS5 - Proposed Development Layout  (view)

                                                                    PAS6 - Elevations  (view)

                                                                    PAS7 - Sections and Roof Plan  (view)

                                                                    PAS8 - Refinement Section Layout  (view)

                                                                    PAS9 - Control Room Fabricate  (view)

                                                                    Photo Plates  (view)

Appendix 4 - The Planning and Legislative Framework and Alternatives - ES4.1 - Local Plan Proposals Map  (view)

Appendix 5 - Ground Conditions and Future Contaminant Risks - ES5.2 - Site Geology (view)

Appendix 6 - Water Resources and Flood Consequences Assessment -

                        6.0 - Volumes 3-7 Executive Summaries  (view)

                        6.1.1 - Environment Agency Assessment of Risk to Ground Water and Surface Water  (view)  (view)

                        6.2.1 - Surface Water Designations -  LLandegfedd Reservoir  (view)

                                                                                             River Usk / Afon WYSG  (view)

                        6.2.2 - Water Quality Data for Surrounding Receptors -   Nitrates Data  (view)

                                                                                                                             Water Quality Data  (view)

                        6.3.1 - Shanks new Effluent Consent  (view)

                        ES6.1 - Site Hydrogeology  (view)

                        ES6.2 - Groundwater Vulnerability Plan  (view)

                        ES6.3 - Local Water Features  (view)

                        6.4 - Flood Consequences Assessment  

                                                                                         6.4.1   FEH Data  (view)

                                                                                                     FEH Slides  (view)

                                                                                         6.4.2   HEC HMS Results  (view)

                                                                                         6.4.3   Photographs of Significant Control Structures  (view)

                                                                                         6.4.4 Tuflow Inputs  - Boundary Conditions  (view)

                                                                                                                             - Cross Sections  (view)

                                                                                                                             - Ponty001  (view)

                                                                                                                             - Ponty004q1000  (view)

                                                                                         6.4.5   Tuflow Output Animated Flood Events    - Q100 Existing Full  (view)

                                                                                                                                                                             - Q100 Existing Site  (view)

                                                                                                                                                                             - Q100 Proposed Mitigation Full  (view)

                                                                                                                                                                             - Q100 Proposed Mitigation Site  (view)

                                                                                                                                                                             - Q1000 Existing  (view)

                                                                                                                                                                             - Q1000 Proposed Mitigation Full  (view)

                                                                                                                                                                             - Q1000 Proposed Mitigation Site  (view)

                                                                                         6.4.6   Runoff Assessment Calculations  (view)

                                                                                         6.4.7   Consultation  (view)

                                                                                         ES6.4 - Site Location, Surface Water Features and Emergency Exit Location  (view)

                                                                                         ES6.5 - Surface Materials Definition for Hydrodynamic Model  (view)

                                                                                         ES6.6 - Cross Section of the Site  (view)

                                                                                         ES6.7 - 1 in 100 Year Return Period Flood Event in Afon Lwyd. Flood Depth for Model Extent  (view)

                                                                                         ES6.8 - 1 in 100 Year Return Period Flood Event in Afon Lwyd. Flood Depth for Site Extent  (view)

                                                                                         ES6.9 - 1 in 100 Year Return Period Flood Event in Afon Lwyd. Flood Velocity for Site Extent  (view)

                                                                                         ES6.10a - 1 in 100 Year Return Period Flood Event in Afon Lwyd. Site Extent Including Proposed Development

                                                                                                          and Mitigation Option 1  (view)

                                                                                         ES6.10b - 1 in 100 Year Return Period Flood Event in Afon Lwyd. Site Extent Including Proposed Development

                                                                                                          and Mitigation Option 2  (view)

                                                                                         ES6.10c - 1 in 100 Year Return Period Flood Event in Afon Lwyd. Between the existing site layout and the

                                                                                                          site containing the proposed raised embankment. Model Extent  (view)

                                                                                         ES6.10d - Cross section of the Pollution Prevention Bund Affected by Mitigation Option 2  (view)

                                                                                         ES6.10e - Proposed Flood Mitigation Bund (Mitigation Option 2)  (view)

                                                                                         ES6.11 - 1 in 1000 Year Return Period Flood Event in Afon Lwyd. Flood Depth for Site Extent  (view)

                                                                                         ES6.12 - 1 in 1000 Year Return Period Flood Event in Afon Lwyd.  Flood Velocity for Site Extent  (view)

                                                                                         ES6.13 - 1 in 1000 Year Return Period Flood Event in Afon Lwyd Site Extent Including Proposed

                                                                                                         Development and Mitigation  (view)

                                                                                         ES6.14 - 1 in 100 Year Return Period Flood Depth and Flood Following a 20% Flow Increase. Model Extent  (view)

                                                                                         ES6.15 - Sensitivity Analysis: Difference Between 1 in 100 Year Return Period Flood Depth and Flood

                                                                                                         Depth Following a 10% Increase in Global Manning n. Model Extent  (view)

                                                                                         ES6.16 - Sensitivity Analysis: Difference Between 1 in 100 Year Return Period Flood Depth and Flood

                                                                                                        Depth Following a 10% Change in the Downstream Boundary Condition Model Extent  (view)

                                                                                         ES6.17 - Sensitivity Analysis: Difference Between 1 in 100 Year Return Period Flood Velocity Following

                                                                                                        a 10% Decrease in Global Manning n. Model Extent  (view)

                                                                                         ES6.18 - Sensitivity Analysis: Steady State 1 in 100 Year Return Period Flood Depth. Model Extent  (view)

                                                                                         ES6.19 - Flood Storage Volumes of the Existing Site  (view)

Appendix 7 - Ecology and Nature Conservation -7.1    SEWBReC Phase 1 Habitat Data  (view)

                                                                                                 SEWBReC Species and Designated Sites  (view)

                                                                                                 SEWBReC Data Search Part 1  (view)

                                                                                                 SEWBReC Data Search Part 2 & Badger Data Search  (view)

                                                                                         7.2   Target Notes  (view)

                                                                                         7.3 & 7.4  Bat Roost Report Forms & Tree Survey Findings  (view)

                                                                                         7.5   Activities Likely to Generate Impacts  (view)

                                                                                         7.6   Aspects of Ecological Structure  (view)

                                                                                         7.7   RCS  (view)

                                                                                         7.8   RCS  (view)

                                                                                         7.9   RCS  (view)

                                                                                         7.10 RCS Report  (view)

                                                                                         7.11 Confidential Badger Findings  (view)

                                                                                         ES7.1 Phase 1 Habitat Survey Map  (view)

                                                                                         ES7.2 River Corridor Survey Map  (view)

                                                                                         ES7.3 Bat Roosting Potential for Buildings  (view)

                                                                                         ES7.4 Bat Roosting Potential for Trees  (view)

                                                                                         ES7.5 Predominant Bird Territories  (view)

                                                                                         ES7.6 Bird Territories Outside the Site  (view)

                                                                                         ES7.7a & 7.7b RCS Sections  (view)

                                                                                         ES7.8 RCS Photoplates  (view)

                                                                                         ES7.9a & 7.9b Cross Sections  (view)

Appendix 8 - Landscape and Visual  -   Quality Classification  (view)

                                                                        ES8.1 Site Location  (view)

                                                                        ES8.2 Site Context  (view)

                                                                        ES8.3 Detailed Site Context  (view)

                                                                        ES8.4 Existing Site Layout  (view)

                                                                        ES8.5-1 Photoplates  (view)

                                                                        ES8.5-2 Photoplates  (view)                               

                                                                        ES8.5-3 Photoplates  (view)

                                                                        ES8.5-4 Photoplates  (view)

                                                                        ES8.5-5 Photoplates  (view)

Appendix 9 - Archaeology and Cultural Heritage -    9.1 RCAHMW CARN Database Search Results  (view)

                                                                                             9.2 NMRW COFLEIN Database Search Results  (view)

                                                                                             Consultation Response from CADW  (view)

                                                                                             Consultation Response from GGAT  (view)

                                                                                             ES9.1 Location of Ancient Monument  (view)

                                                                                             ES9.2 Location of Archaeological Cultural Heritage Resources  (view)

                                                                                             ES9.3 Extract from panteg tithe Map  (view)

                                                                                             ES9.4 Extract from the 1st Edition Map  (view)

Appendix 10 - Highways, Traffic and Public Rights of Way-Accident Data (view)

                                                                                                             Letter Dated 25 August  (view)

                                                                                                             PAS11a Waste Delivery Vehicles Inbound  (view)

                                                                                                             PAS11b Waste Delivery Vehicles Outbound  (view)

                                                                                                             PAS11c Product Collections Vehicles Inbound  (view)

                                                                                                             PAS11d Product Collection Vehicles Outbound  (view)

                                                                                                             PAS12a Proposed Site Access Based on Topographical Survey  (view)

                                                                                                             PAS12b Swept Path of Large Refuse Vehicle Accessing Proposed

                                                                                                                            Site Access Based on Topographical Survey  (view)

Appendix 11 - Air Quality and Odour -     11.1 Roose Met. Data Windrose Plots (200-2004)  (view)

                                                                        11.2 Modelled Domain and Extent of Cartesian Grid  (view)

                                                                        11.3 Modelled Discrete Receptor Locations (D1 – D16)  (view)

                                                                        11.4 Predicted Dispersal of the Annual Mean Ground Level PEC PM10 (2004)  (view)

                                                                        11.5 Predicted Dispersal of the 90.4%ile Daily Mean Ground Level PEC PM10 (2004)  (view)

                                                                        11.6 Predicted Dispersal of the Annual Mean Ground Level PEC H2S (2004)  (view)

                                                                        11.7 Predicted Dispersal of Hourly Average Ground Level PEC H2S (2001)  (view)

                                                                        11.8 Predicted Dispersal of 98th %ile Hourly Mean Ground Level Odour Concentrations (2000)  (view)

                                                                                 Annex 1 H1  (view)

Appendix 12 – Noise -   Detailed Survey Results  (view)

                                            ES12.1 Noise Monitoring Locations  (view)

Appendix 13 - None

Appendix 14 - None

 

Further Information

Should you require a paper copy of the Environmental Statement or further information relating to this proposal, please write to Shanks Waste Management Ltd at the address shown on the Non Technical Summary.

 

A paper copy of the non technical summary is available free of charge at the address shown on the Non Technical Summary.

 

 

 

 

 

 

 

 

 

 

Susan Evans

 

21/12/06

 

Golder Associates (UK) Ltd

Golder House

Tadcaster Enterprise Park

Station Road

Tadcaster

North Yorkshire

LS24 9JF

 

Tel : 01937 837800

Fax: 01937 837850